Capability 04 / Finishing
Finishing and treatments
The work after the machining is where parts go wrong: edges, finishes, treatments and the travelling in between. We do what we can in-house and manage the rest through partners we audit, so you get one delivery, finished, with the certificates.


Finishes
In-house and through partners.
Partner treatments go out and come back on our paperwork, inspected on arrival, with their certificates added to the batch file.

| Finish | Where | Notes |
|---|---|---|
| Deburr and edge break | In-house | To drawing; 0.2 to 0.5 mm × 45° unless stated |
| Vibratory finishing | In-house | Batch deburr and radius, ceramic or plastic media |
| Glass bead blasting | In-house | Even satin finish, cabinet 1,200 × 800 mm |
| Cylindrical grinding | In-house | Ø 300 × 650 mm, ±0.003 mm, Ra 0.2 µm |
| Surface grinding | In-house | 600 × 300 mm, 0.005 mm parallel |
| Laser marking | In-house | Part numbers, serials, data matrix codes |
| Anodising: clear, colour and hard | Approved partner | To your specification and thickness |
| Zinc, zinc-nickel and electroless nickel | Approved partner | With passivate and bake as specified |
| Powder coating and wet paint | Approved partner | RAL and BS colours, masking to drawing |
| Heat treatment | Approved partner | Hardening, tempering, case hardening, stress relief, with certificates |
Why it matters
Finished means ready to fit.
A part with a sharp edge, a scratched face or a treatment that doesn't match the drawing is still a reject, however good the machining was. Finishing is planned at quote, on the route card, and inspected before it ships.
- Masking and plugging planned before the part leaves
- Thread and bore protection through treatment
- Final inspection after finishing, not before
- Packed to protect the finish, to your packaging spec

